What Happens When A University Needs A More Effective Approach To Data Center Locations And Management?

Jessica Ciesla
December 27, 2018

All too often shrinking budgets within the education sector cause an array of IT challenges. For one large state university in the northeast, the challenge of a shrinking budget was threatening to limit their ability to use more than one data center. In order to overcome this challenge, the university turned to the Raritan team for a bit of help and of course expertise in data monitoring, security, and storage solutions.

Understanding The Challenge

The challenge of a shrinking budget involved a number of moving parts for our client.
1.    The university wanted to consolidate data center facilities. 
2.    By combining the core data centers, they wanted to effectively create a single DR site. 
3.    Operations needed to be closely monitored throughout the transition. 
4.    University clients needed to receive effective computing resources during and after the transition. 

Creating An Effective Solution

We approached the university's challenges by creating a solution with a dual focus. This focus included, a) monitoring operations, and b) increasing the effectiveness of the data center.

To start, we leveraged the power of PDUs to create an environment where monitoring started at the outlet level. Next, we used DC operations to increase the existing capacity and utilization of new and existing technologies. This approach enabled operations managers to effectively know what devices were being added, how much power was being consumed, and what levels of cooling were being provided. Understanding the latter three factors allowed the operations managers to more effectively deploy IT assets within the designated space. Finally, through additional environmental sensors, as well as a DCIM monitoring solution, the entire DC floor was thermally mapped to accurately identify areas in need of attention. The customized alerts were designed to identify specific locations (within the cabinet) where a problem had occurred. Once the exact location had been identified, the team could then go in and resolve the issue before it spread, impacted additional spaces, or resulted in downtime. 

The Result: Improved Monitoring And Increased Capabilities

Through outlet metered intelligent PDUs, environmental sensors, and a DCIM software deployment, we were able to effectively help the university overcome the challenges associated with a shrinking budget. By completely understanding the additional obstacles associated with a data center consolidation, we created a solution that saved the university money, while simultaneously deploying an environment with increased visibility and actionable insights. The end result was a data center that could be effectively monitored and maintained to readily meet its specific needs and future requirements.

To learn more, please visit our website here. 
 

Other Blog Posts

Engineering Rack-Level Infrastructure for High-Performance Environments
How HPC and AI Workloads Are Reshaping Rack Design
Posted on July 28, 2026
Secure by Design: What to Look for in a Modern KVM Platform
Why Security Architecture Matters for Out-of-Band Management
Posted on July 28, 2026
How AI and NVIDIA MGX™ Are Changing Rack Design for Hyperscale and Neocloud Environments
Posted on July 13, 2026
Understanding Neocloud Infrastructure in the Age of AI
Posted on June 1, 2026
Beyond Containment: How Advanced Sensing Is Changing Data Center Cooling
Posted on June 1, 2026

View all Blog Posts

Subscribe


Upcoming Events

2026 OCP Global Summit
October 12 - 15  •  San Jose Convention Center - San Jose, CA
DCD Connect VA
November 3 – 4  •  Lansdown Resort - Leesburg, VA

View all Events

Latest Raritan News

Legrand Introduces Next-Generation KVM Platform Built to Bring Critical Systems Back Online in Minutes
Posted on July 20, 2026
Greater Choice, Scalability, Speed: Why Legrand is Doubling Down on Open Compute Project Innovations
Posted on October 3, 2025
Legrand Brings Greater Flexibility to Data Center Operators with New Intelligent Rack PDU Universal Input Option
Posted on February 26, 2025
Legrand Expands Full Suite of DX2 SmartSensors, Keeping Data Centers Ahead of Rack Power and Environmental Monitoring Challenges
Posted on December 18, 2024
Legrand Wins Back-to-Back Awards for Intelligent Rack Power Distribution Innovation
Posted on May 24, 2024

View all news