Rack PDUs in a Server Rack

Why do we load balance?

Without going into the complicated math, suffice it to say that load balancing in a 3 phase system is desirable.  The more unbalanced a system the more problems it creates.  UPS life, for one, can be affected by unbalanced systems.  Although one circuit (server cabinet) being out of balance won’t have much effect, if many or all circuits on a panel are out of balance, the main circuit supplying the breaker panel will be out of balance and this can ruin your upstream UPS.  There are also efficiency issues with unbalanced loads.

How is load balancing currently accomplished in a rack cabinet?

To balance a load in a cabinet, the loads of the equipment power supplies are spread across the 3 phases – L1/L2, L2/L3, L3/L1.  This is done by plugging the first server (or switch/router) in an outlet wired on L1/L2, the next server on L2/L3, the next on L3/L1, then start over.  The goal is to get an equal number of devices/loads on all 3 phases – or as close as possible. 

This approach can quickly turn into a cabling nightmare. Most rack PDUs are linear in their phase layout of outlets – there are only three banks of outlets, one for each phase.  For example, on a 36 outlet PDU, outlets 1 through 12 will be on L1/L2, 13 through 24 on L2/L3, and 25 through 36 on L3/L1.  If you use the above method of balancing, and start racking the devices at the bottom U position, the third device you plug in will need to reach the top third of the PDU and the last device may have to reach back to the bottom of the PDU.  In other words, a lot of crisscrossed cabling.

How do Raritan’s balance the cable and load balancing challenge?

In certain Raritan PX three-phase models the architecture gets around the cabling issue by staggering the grouping of outlets - there are at least 6 banks of outlets.  For example, outlets 1 through 6 are on L1/L2, 7 through 12 on L2/L3, 13 through 18 on L3/L1, but then we start over at L1/L2 for outlets 19 through 24. (See Illustration below)

This intelligently engineered architecture results in more reliability and easier execution.  The devices towards the top of the cabinet don’t need to be plugged in to the bottom of the PDU and devices at the bottom don’t need to be plugged in to the top.

Raritan V2 Architecture Diagram

The Result

By using Raritan’s alternate circuit phase sequencing, you will be able to more easily and efficiently balance your cabinet load. The approach simplifies deployment of IT devices and balances the three lines to get the most power headroom.  Also, tracing a power cord to a device becomes much easier and thus, unplugging the wrong device during maintenance or replacement will be less likely. Resulting in less downtime… always a good thing!

Other Blog Posts

Rack PDUs Outlet Density and Types
Posted on November 14, 2019
Mobile App For Your KX IV-101
Posted on October 15, 2019
What Is Environmental Monitoring?
Posted on September 18, 2019
Different Types of Rack PDUs
Posted on September 10, 2019
Power Monitoring And Metering
Posted on August 28, 2019

View all Blog Posts

Subscribe


Upcoming Events

West 2019
February 13 - 15  •  San Diego, CA
Data Center World Global 2019
March 19 - 22  •  Phoenix, AZ
Data Center Dynamics NY
April 9 - 10  •  New York, NY
NAB 2019 - National Association of Broadcasters Show
April 6 - 11  •  Las Vegas
Interop 19
May 20 - 23  •  Las Vegas, NV

View all Events

Latest Raritan News

Extended IT rack power mapping possibilities with Raritan’s locking solution
Posted on October 23, 2019
Raritan Ranked as the Global Leader in KVM-over-IP Switches
Posted on October 21, 2019
Raritan’s New KVM-over-IP User Station Brings 4K Performance and Productivity to Remote Equipment Access
Posted on September 18, 2019
Raritan’s New 4K Ultra HD KVM-over-IP Switch Wins Best of Show Award at NAB
Posted on May 21, 2019
Raritan Unveils KVM-over-IP Switch with Enhanced Performance and 4K Ultra HD
Posted on April 4, 2019

View all news