Avoiding Unscheduled Downtime by Removing the Guesswork from Rack Loading

Jon Inaba
June 18, 2014

Traditionally, data center operators and IT professionals have used a very simple process to create a safe “A” side to “B” side failover scenario. The process and math are very straight forward. The user decides what a safe threshold is - typically 80% of the total kVA of the enclosure - and divides that value evenly between both rack power strips and their onboard circuit breakers.  Due to the relative simplicity of the architecture, this practice can work well in a single-phase, less than 5kVA environment.  However, in power kVA environments greater than 5kVA, and more complex three-phase environments that are now typical for blade and high density environments, this practice dramatically increases the likelihood of encountering a cascading failure and creates the additional downside of stranding large amounts of available space, power and cooling resources in the process.  

In order to be truly safe and avoid the negative side effects of stranding otherwise available resources, the data center operator must be able to precisely model their environment.  Ideally, this means having a data driven model that reflects both the max and average loading across all outlets, circuit breakers, and the inlet power lines.  Acquiring a usable level of precision and accuracy is extremely difficult for most operators for a variety of reasons, but the biggest challenge to overcome is the ability to correlate these data points across multiple power strips.

Even with the help of a clipboard and calculator, most of us simply can’t do the relatively complex mathematics necessary to understand the effects of additional loading or a failover in a three-phase system.  This is where employing intelligent rack PDUs and a power management system is highly advantageous. Rack PDUs can automatically collect real-time power information down to the outlet-level and provide aggregate power values across multiple strips. With this type and quality of data, commissioning is done with extreme accuracy and potential threats are eliminated. 

Watch this video to learn how some data centers use power management systems to find stranded capacity and improve data center efficiency.

Other Blog Posts

The Rapid Growth of AI and the Use of Raritan PDUs to Meet Higher Power Demands
Posted on October 11, 2023
Data Center Report Fewer Outages, But Downtime Still Costly
Posted on September 20, 2023
Survey: Energy Usage and Staffing Shortages Challenge Data Centers
Posted on September 20, 2023
Raritan Secure Switch: Secure NIAP 4.0 Compliant Desktop KVM
Posted on September 20, 2023
The Midwest is a Hot Market for Data Centers: How the New Generation of Intelligent Rack PDUs Can Save Cloud Giants Uptime and Money
Posted on September 7, 2023

View all Blog Posts

Subscribe


Upcoming Events

Advancing Data Center Construction West 2024
May 6 – 8  •  Salt Lake City, UT
Net Zero Data Center
May 16 – 17  •  Dallas, TX
7x24 Exchange Spring
June 9th  •  JW Marriott Orlando Grande Lakes

View all Events

Latest Raritan News

Legrand Certifications and Process Controls Provide Confidence in Information Security for Network-Connected Devices in Data-Related Applications
Posted on April 1, 2024
Legrand Releases Version 4.0 of Raritan’s Industry-Leading Secure KVM Switches, Raising Bar for Secure Desktop Access
Posted on July 31, 2023
Legrand Revitalizes Data Center Sector with Two Revolutionary Intelligent Rack PDUs
Posted on May 1, 2023
Raritan Reveals The MasterConsole® Digital Dual KVM Switch
Posted on February 18, 2021
Legrand Data, Power and Control Division Announced as Finalist in Six Categories at DCS Awards 2020
Posted on November 9, 2020

View all news