The Raritan Blog

DCIM, A Holistic, Shared View of the Data Center

Posted on January 28, 2013 by Gento

DCIM-Data-Center

A data center is the domain of several different work groups in an enterprise.  A facilities group is responsible for such physical elements as the cooling plant and the power plant. The IT infrastructure group is responsible for the networking resources - everything from the structured cabling, to the networks, to the SANs and LANs. Then you have the IT systems group, responsible for the whole system, the servers, the storage systems, etc.  In the days of on-premise data centers, these groups worked in close physical proximity with each other and with their end users.

Over the past several years, more and more enterprise data centers have become stand-alone facilities.  No longer attached to the corporate headquarters building, they have increased the need for lights-out operation on the IT side. A new group of workers, data center ops, now manages day-to-day operations.  They’re in charge of fulfilling requests from the various groups, racking and stacking the servers, connecting them to the power chain and to the network infrastructure.

What I have been seeing in practice is that data center ops groups tend to react to these requests in a totally manual and painfully inefficient way. They may send a technician to figure out the rack spaces available.  They may send a second person to figure out the cabling and networking resources available in that cabinet and they may send a third to figure out what power is available in those cabinets.

Some of our customers have told me that this process can take so long - often several weeks - that by the time they’ve figured out these resources and their upstream dependencies, the rack space is gone.  Lacking the tools to communicate data center resources properly among all requesting groups, the ops end up resorting to manual processes.

Good Data Center Infrastructure Management (DCIM) tools address both pain points here — the repetitive, on-premise checking for data center assets, and the communication gap between departments and domains that lets those resources run out before requests can be filled.

DCIM systems start with a thorough configuration of all the assets in a data center, including their connections, and their upstream and downstream dependencies. We look at not only how much power there is, but how many network switches, ports, and power strips you have and how much power you have available in every rack - how everything is connected. You might like to know, for example, how an infrastructure element such as a circuit breaker or a network switch port may have an impact upstream on the servers that are connected to that breaker. Or you might want to know what applications are running on these servers and what departments or business units are being supported by these applications.  These problems become very difficult to solve, especially on the fly and under the stress of resolving a problem.

Visualization tools within DCIM should give data center operators and managers top views of the data center, from which they can drill down to a rack, to every device and server in the rack, and even see its front and back so they can understand what ports are configured on that device.

The discipline part of the solution — enforceable through DCIM tools — is a consistent application of change management processes, so that data center changes and installations are recorded and the overall picture is kept accurate.

A true DCIM, then, is a holistic system with components to serve many disparate groups, whether they are the technicians, the administrators, the managers or even the VPs that run each of these groups.

Other Blog Posts

What Is a Neocloud—and Why It Matters for Modern Data Centers
Posted on June 1, 2026
Beyond Containment: How Advanced Sensing Is Changing Data Center Cooling
Posted on June 1, 2026
Universal Input: Delivering Seamless Plug-and-Play Flexibility in Data Centers with Universal Input
Posted on March 1, 2026
The Intelligent PDU: A Critical Component for Power Management in AI Data Centers
Posted on December 17, 2025
How Remote Medical Scanning Streamlines Operations and Improves Patient Satisfaction
Posted on November 24, 2025

View all Blog Posts

Subscribe

Upcoming Events

Japan Cloud & Datacenter Convention 2025
06 Jun 2025  •  Tokyo, Japan
Interop Tokyo 2025
11 Jun - 13 Jun 2025  •  Chiba, Japan
Suntelephone ICT Business Solution 2025 (Sendai)
17 Jun 2025  •  Sendai, Japan
Suntelephone ICT Business Solution 2025 (Kanazawa)
25 Jun 2025  •  Kanazawa, Japan
Suntelephone ICT Business Solution 2025 (Takamatsu)
04 Jul 2025  •  Takamatsu, Japan

View all Events

Latest News

Legrand Introduces Next-Generation KVM Platform Built to Bring Critical Systems Back Online in Minutes
Posted on October 22, 2026
Legrand Certifications and Process Controls Provide Confidence in Information Security for Network-Connected Devices in Data-Related Applications
Posted on July 1, 2024
Legrand Revitalizes Data Center Sector with Two Revolutionary Intelligent Rack PDUs
Posted on May 1, 2023
Exclusive interview丨How does Huizhou upgrade its manufacturing industry?
Posted on December 2, 2021
Raritan Reveals The MasterConsole® Digital Dual KVM Switch
Posted on February 18, 2021

View all news