Traditionally, data center operators and IT professionals have used a very simple process to create a safe “A” side to “B” side failover scenario. The process and math are very straight forward. The user decides what a safe threshold is - typically 80% of the total kVA of the enclosure - and divides that value evenly between both rack power strips and their onboard circuit breakers.  Due to the relative simplicity of the architecture, this practice can work well in a single-phase, less than 5kVA environment.  However, in power kVA environments greater than 5kVA, and more complex three-phase environments that are now typical for blade and high density environments, this practice dramatically increases the likelihood of encountering a cascading failure and creates the additional downside of stranding large amounts of available space, power and cooling resources in the process.  

In order to be truly safe and avoid the negative side effects of stranding otherwise available resources, the data center operator must be able to precisely model their environment.  Ideally, this means having a data driven model that reflects both the max and average loading across all outlets, circuit breakers, and the inlet power lines.  Acquiring a usable level of precision and accuracy is extremely difficult for most operators for a variety of reasons, but the biggest challenge to overcome is the ability to correlate these data points across multiple power strips.

Even with the help of a clipboard and calculator, most of us simply can’t do the relatively complex mathematics necessary to understand the effects of additional loading or a failover in a three-phase system.  This is where employing intelligent rack PDUs and a power management system is highly advantageous. Rack PDUs can automatically collect real-time power information down to the outlet-level and provide aggregate power values across multiple strips. With this type and quality of data, commissioning is done with extreme accuracy and potential threats are eliminated. 

Watch this video to learn how some data centers use power management systems to find stranded capacity and improve data center efficiency.

Other Blog Posts

了解人工智能时代的Neocloud基础设施
Posted on June 1, 2026
不被定义:看专业的传感技术如何改变数据中心冷却方式
Posted on June 1, 2026
通用输入:通过通用输入为数据中心提供无缝即插即用的灵活性
Posted on March 1, 2026
智能PDU:人工智能数据中心电源管理的关键组件
Posted on December 17, 2025
远程医疗影像扫描(远程超声/远程影像诊断/远程会诊系统)如何优化医院运营流程并提升患者满意度
Posted on November 24, 2025

View all Blog Posts

力登官方微信公众号
cn-blogfollow

近期活动

Japan Cloud & Datacenter Convention 2025
06 Jun 2025  •  Tokyo, Japan
Interop Tokyo 2025
11 Jun - 13 Jun 2025  •  Chiba, Japan
Suntelephone ICT Business Solution 2025 (Sendai)
17 Jun 2025  •  Sendai, Japan
Suntelephone ICT Business Solution 2025 (Kanazawa)
25 Jun 2025  •  Kanazawa, Japan
Suntelephone ICT Business Solution 2025 (Takamatsu)
04 Jul 2025  •  Takamatsu, Japan

View all Events

力登最新新闻

罗格朗推出新一代KVM平台,旨在数分钟内让关键系统恢复在线
Posted on October 22, 2026
罗格朗获得的行业认证和严格控制的生产流程,增强了数据中心运营中连网设备的稳定性。
Posted on July 1, 2024
重振数据中心行业——罗格朗重磅推出两款新的智能机架式PDU产品!
Posted on May 1, 2023
独家专访丨惠州如何升级制造业?法资企业CEO提了个建议
Posted on December 2, 2021
力登公司推出MasterConsole®数字双显示器KVM切换器
Posted on February 18, 2021

View all news